Ramp-up Factory I & II

 

Emission-Free Complete System for Cities

Ramp-up Factory Copyright: PEM

Motivation and General Procedure

As part of the “Adaptive City Mobility 2” project, PEM at RWTH Aachen University will be responsible for the structure and assembly of the pilot vehicles. Solutions for the vehicle structure are to meet research objectives in the three areas as outlined below, providing suitable use cases in the areas of vehicle body paneling for adjustment concepts or interior assembly of equipment concepts.

The solutions arrived at can be implemented, tested, and validated using the pilot vehicles; at a later stage, in the vehicle production program, they can be drawn upon as “lessons learned.” By focusing on solutions for small-batch series production, this sub-project shall provide an important contribution to further develop and advance electric mobility in Germany.

  Logo Ziel2.NRW

Research Objectives

  • Prototype Building and Testing
  • Effiency optimization of Production Processes
  • High-qualitiy Ramp Up and shorter Ramp-up Time
  Logo Federal Ministry for Economic Affairs and Energy   Logo Ministry NRW   Logo EU